8 cubic meter
10 cubic meter
12 cubic meter
15 cubic meter
equal to the cross slope of pavement
less than the cross slope of pavement
greater than the cross slope of pavement
zero
cement
lime
bitumen
none of the above
sides and proceed to center
center and proceed to sides
one side and proceed to other side
any of the above
dry rolling, wet rolling, application of screening and application of filler
dry rolling, application of filler, wet rolling and application of screening
dry rolling, application of screening, wet rolling and application of filler
dry rolling, application of screening, application of filler and wet rolling