300) The time which results in the least possible direct cost of an activity is known as
Answer is:
slow time
Related Production and Industrial Engineering MCQ with Answers
Answer is:
critical ratio scheduling
Answer is:
none of the above.
Answer is:
all of the above.
Explanation:
PERT is
* an analytic tool in concept
* limit up of event oriented diagrams
* used for research and development projects
Answer is:
all of the above.
Explanation:
CPM is
* synthesising in concepts
* is built of activities oriented programmes
* is, based on one time estimate