262) PMTP (predetermined motion time systems) include
Answer is:
all of the above
Related Production and Industrial Engineering MCQ with Answers
Answer is:
method study and work measurement
Explanation:
Work study consists of two techniques namely method study and work measurement.
The method study is a technique to simplify the job and develop more economical methods of doing it.
The Work measurement is concerned with the elimination of ineffective time and establishment of time standards for a job.
Work study is mainly aimed at determining the most efficient method of performing a job. Basic tool in work study is stop watch.