1. Operation: An operation is an action performed for advancing towards desired result. This indicates the main steps in a process, method or procedure.
2.Inspection: An inspection occurs when the product is removed for a time for production. It includes the visual observations for finish, checking the dimensions etc.
3.Storage: A storing occurs when the product is removed for a time from production. For example, materials kept in stores to be distributed to various work.
4.Delay: A delay occurs when some undesirable event prevents or hinders the next planned activity e.g. waiting for a machine to be repaired. A traffic jam. Work waiting between consecutive operations.
5. Transport : A transport occurs when there is movement from one place to another. It indicates the movement of materials from one work station to another.
145) What does symbol 'V' employ in work study
Answer is:
permanent storage
Explanation:
Related Production and Industrial Engineering MCQ with Answers
Answer is:
overhead crane
Explanation:
Overhead crane is used for lifting loads and transport to another location.
An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of parallel runways with a traveling bridge spanning the gap. A hoist, the lifting component of a crane, travels along the bridge. If the bridge is rigidly supported on two or more legs running on a fixed rail at ground level, the crane is called a gantry crane or a goliath crane.
Answer is:
subdivision of an operation into therbligs and their analysis
Explanation:
Micro motion study is one of the most accurate techniques of work analysis used for work improvement. It makes use of motion pictures of the different activities or movement, so with the help of camera.