147) String diagram is used when
Answer is:
team of workers is working at a place
Related Production and Industrial Engineering MCQ with Answers
Answer is:
subdivision of an operation into therbligs and their analysis
Explanation:
Micro motion study is one of the most accurate techniques of work analysis used for work improvement. It makes use of motion pictures of the different activities or movement, so with the help of camera.
Answer is:
standard symbol and colour.
Explanation:
In micromotion study, therblig is described by standard symbol and colour.
Therbligs are 18 kinds of elemental motions, used in the study of motion economy in the workplace. A workplace task is analyzed by recording each of the therblig units for a process, with the results used for optimization of manual labour by eliminating unneeded movements.