12) Drills may be overheated if
Answer is:
Any of the above
Related ISRO Technician-B Turner Question Paper - 2019 (Set-1) with Answer Key
Answer is:
Knurling operation to be done at high speeds
Answer is:
The job axis is kept out of alignment to the lathe axis and the tool made to move parallel to the lathe axis
Answer is: