22) Which load is to be connected from stand by generator set in the event of failure of mains?
Answer is:
Fire lift and water pumps
Related Estimation and costing of wiring MCQ with Answers
Answer is:
Not less than 1m
Answer is:
Diversity factor
Answer is:
Near to termination of service line
Answer is: