46) Which levelling is done to connect the B.M to any intermediate point of the alignment for checking the accuracy of the work?
Answer is:
Fly levelling
Related Levelling Survey MCQ with Answers
Answer is:
Fly levelling
Answer is:
Check levelling
Answer is:
Barometric levelling
Answer is: