33) How the space between the false ceiling and the building main ceiling is used in handling of air in central AC plant?
Answer is:
Return air duct
Related HVAC Plant MCQ with Answers
Answer is:
Air distribution system
Answer is:
Centrifugal blower fan
Answer is: