21) Which method of shut piles are driven in the ground and therefore the bearing B.C of soil is increased?
Answer is:
Continuing soil method
Related Temporary Structure MCQ with Answers
Answer is:
Grouting method
Answer is:
Sub surface sounding method
Answer is: