paid as per efficiency
ensured of minimum wages
not paid any bonus till his efficiency 2 reaches 66 %
never a loser
purchase value
saleable value
depreciated value
function/cost.
short run analysis
long run analysis
average of above two run analysis
there is no such criterion
one time estimate
two time estimate
three time estimate
four time estimate