109) In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
Answer is:
6.61
Related Production and Industrial Engineering MCQ with Answers
Answer is:
HA + (S~A) HA
Answer is:
2 HA
Answer is:
those items which consume more money
Explanation:
In materials management, ABC analysis is an inventory categorization technique. ABC analysis divides an inventory into three categories—
"A items" with very tight control and accurate records,
"B items" with less tightly controlled and good records, and
"C items" with the simplest controls possible and minimal records.