1. Operation: An operation is an action performed for advancing towards desired result. This indicates the main steps in a process, method or procedure.
2.Inspection: An inspection occurs when the product is removed for a time for production. It includes the visual observations for finish, checking the dimensions etc.
3.Storage: A storing occurs when the product is removed for a time from production. For example, materials kept in stores to be distributed to various work.
4.Delay: A delay occurs when some undesirable event prevents or hinders the next planned activity e.g. waiting for a machine to be repaired. A traffic jam. Work waiting between consecutive operations.
5. Transport : A transport occurs when there is movement from one place to another. It indicates the movement of materials from one work station to another.
10) What does symbol 'D' imply in work study
Answer is:
delay temporary storage
Explanation:
Related Production and Industrial Engineering MCQ with Answers
Answer is:
minimum value
Explanation:
In perpetual inventory control, the material is checked as it reaches its Minimum value.
Answer is:
overhead crane
Explanation:
Overhead crane is used for lifting loads and transport to another location.
An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of parallel runways with a traveling bridge spanning the gap. A hoist, the lifting component of a crane, travels along the bridge. If the bridge is rigidly supported on two or more legs running on a fixed rail at ground level, the crane is called a gantry crane or a goliath crane.