Work measurement is concerned with the determination of the amount of time required to perform a unit of work. Work measurement is very important for promoting productivity of an organization. It enables management to compare alternate methods and also to do initial staffing. Work measurement provides basis for proper planning.
Objectives of Work Measurement are
1. plan and schedule of production
2. estimate the selling prices and delivery dates
4) The main objective of work measurement is to
Answer is:
all of the above
Explanation:
Related Industrial Engineering MCQ with Answers
Answer is:
representative time
Explanation:
The average time recorded by work study man for an operation is called Representative time.
Answer is:
standard time
Explanation:
The time taken by a trained worker to perform an operation, while working a steady pace, is known as Standard time.
Answer is:
all of the above
Explanation:
String diagram is one of the useful and simplest techniques of method study.
It can be defined as a scale model on which a thread is used to trace the path or movements of man and materials during a specified sequence of events.
It can also be stated that string diagram in a special form of flow diagram.
Answer is:
flow diagram
Explanation:
A diagram showing the path followed by men and materials while performing a task is known as Flow diagram.