A predetermined motion time system (PMTS) is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor (labour) oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions.
19) P. M. T. S ( Predetermined Motion Time System) include
Answer is:
All of these
Explanation:
Related Industrial Engineering MCQ with Answers
Answer is:
all of the above
Explanation:
M.T.M. is used to
- Improve existing methods
- Establish time standards
- Develop effective methods in advance of the beginning of production
Answer is:
all of these
Explanation:
Abbreviated work factor data is applied for
* material handling operation
* maintenance operation
* packing and shipping operation
Answer is:
all of these
Explanation:
Break even analysis consists of
* fixed expenses
* variable cost
* sales revenue