126) The correct sequence of phase in value engineering is
Answer is:
creative phase, information phase, investigation phase, evaluation phase
Related Industrial Engineering MCQ with Answers
Answer is:
cost reduction
Explanation:
In value engineering, important consideration is given to cost reduction.
Answer is:
production is on large scale
Explanation:
Value analysis is particularly of interest when Production is on large scale.
Answer is:
all of the above
Explanation:
following conditions are necessary for applying linear programming is listed below:
-These must be a well defined objective function.
- The decision variables should be interrelated and nonnegative.
- The resources must be in limited supply.
Answer is:
linear programming
Explanation:
Linear programming is a method to achieve the best outcome in a mathematical model whose requirements are represented by linear relationships.
Linear programming is a special case of mathematical programming.