Standard time is equal to (Normal time) + (allowances).
The standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method.
12) Standard time is equal to
Answer is:
normal time + allowances
Explanation:
Related Industrial Engineering MCQ with Answers
Answer is:
analysis of standard data system
Explanation:
The determination of standard time in a complex job system is best done through Analysis of standard data system.
Answer is:
all of these
Explanation:
A systematic job improvement sequence will consist of Motion study Time study Job enrichment.
Answer is:
all of the above
Explanation:
Time study is a structured process of directly observing and measuring human work using a timing device to establish the time required for completion of the work by a qualified worker when working at a defined level of performance.
Answer is:
an average worker
Explanation:
Time study is carried out to determine the time required to complete job by An average worker.