109) Routing
Answer is:
prescribes the sequence of operations to be followed
Related Industrial Engineering MCQ with Answers
Answer is:
machine utilization
Explanation:
The routing function in a production system design is concerned with Machine utilization.
Answer is:
all of these
Explanation:
The factors to be considered for production scheduling are
* component design
* route sheet
* time standards
Answer is:
is concerned with the starting of processes
Explanation:
Dispatching also provides a means for comparing actual progress with planned production progress.
Dispatching functions include;
Providing for movement of raw materials from stores to the first operation and from one operation to the next operation till all the operations are carried out.