143) Select the incorrect statement.
Answer is:
Go or green time of a signal is the sum of stop and clearance intervals for the cross flow.
Related Transportation Engineering MCQ with Answers
Answer is:
crosswalk lines
Answer is:
different radii and different widths of pavement
Answer is: