189) The initial setting time for ordinary Portland cement as per IS specifications should not be less than
Answer is:
30 minutes
Related Structural Engineering I MCQ with Answers
190) As per IS specifications, the maximum final setting time for ordinary Portland cement should be
Answer is:
10 hours
Answer is: